Why was my street selected to be resurfaced?

In addition to performing an annual road assessment, the Village looks at data compiled using a standard industry process to establish roadway conditions. If your street is being worked on it was determined to be a high priority for that year. Roads are selected based on a few determining factors, including pavement cracking, pot holes, slopes and/or grading issues.

Show All Answers

1. What work will be done?
2. What is a curb? What is it used for?
3. Will I have access to my driveway?
4. Why isn't my curb being replaced?
5. Why isn't my entire apron being replaced?
6. Why was the sidewalk on the corner removed?
7. They worked on my curb, and now the curb and driveway aren't the same height. Why is this?
8. Why didn't they fix a larger section of my curb?
9. The grass was not restored. Will this ever get done?
10. Why was my street selected to be resurfaced?
11. Will school buses and garbage trucks be able to use the road?
12. What happens if the contractor damages my mailbox or sprinkler system?
13. Will the road be closed?
14. Why does it take so long to complete the project? Why isn't the contractor working today?
15. Can I drive on tack oil?
16. What if I have special needs?
17. What are some tips to ensure proper grass restoration when construction is completed?